Chokecherry and Sierra Madre Wind Energy Project. 220,000 acres of federal land in Carbon County, Wyoming. Installed 1000 turbines. Average wind speed 9.2 meters/sec. year around. Project required a HVDC and HVAC line called the TransWest Express. Longest onshore HVDC transmission line in the US. 732 miles of high-voltage transmission infrastructure consisting of two systems:
(Read More…)




