This makes good sense. If the charger is V2G then it would already be under control of the grid. The chargers could be (and probably are) WiFi enabled so they could be enabled, disabled or controlled remotely by the utility.
https://insideevs.com/news/537120/ev-chargers-switched-off-uk/