The narrator goes to the offshore wind turbine to show us a 6.2 MW wind turbine.
The key takeaway is that these offshore wind turbines solve the wind turbine intermittency problem because it’s windy as hell out there 24 hours, 365 days a year.
He said the transmission line to southern Germany was supposed to be done in 2022 but public protest held it up until 2026 or even later.
In another website we see that wind turbine blades are repurposed as a shelter over bike racks.
https://www.designboom.com/design/denmark-repurposing-wind-turbine-blades-bike-garages-09-27-2021/
The blades that are not repurposed are ground up and mixed into cement.