{"id":17728,"date":"2022-02-25T12:14:02","date_gmt":"2022-02-25T20:14:02","guid":{"rendered":"https:\/\/rustybolt.info\/wordpress\/?p=17728"},"modified":"2022-02-25T12:20:50","modified_gmt":"2022-02-25T20:20:50","slug":"2022-02-25-smr-too-late-too-risky-report","status":"publish","type":"post","link":"https:\/\/rustybolt.info\/wordpress\/?p=17728","title":{"rendered":"2022-02-25 SMR &#8220;Too Late, Too Risky&#8221; &#8211; Report"},"content":{"rendered":"<p>A quote from this IEEFA report:<\/p>\n<p>&lt;&lt; The small modular reactor (SMR) that Oregon-based NuScale Power has been developing since the turn of the century is \u201ctoo late, too expensive, too risky, and too uncertain,\u201d according to an analysis conducted by an American think tank that recommends the project be abandoned.<\/p>\n<p>Best estimates are that NuScale\u2019s long-promised SMR won\u2019t generate electricity before 2029, which\u2014on top of a host of other challenges\u2014just isn\u2019t soon enough, says the Institute for Energy Economics and Financial Analysis (IEEFA). &gt;&gt;<\/p>\n<p><a href=\"https:\/\/www.theenergymix.com\/2022\/02\/20\/u-s-small-modular-reactor-design-too-late-too-risky-analyst-concludes\/\">https:\/\/www.theenergymix.com\/2022\/02\/20\/u-s-small-modular-reactor-design-too-late-too-risky-analyst-concludes\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A quote from this IEEFA report: &lt;&lt; The small modular reactor (SMR) that Oregon-based NuScale Power has been developing since the turn of the century is \u201ctoo late, too expensive, too risky, and too uncertain,\u201d according to an analysis conducted by an American think tank that recommends the project be abandoned. Best estimates are that<a href=\"https:\/\/rustybolt.info\/wordpress\/?p=17728\"> <\/p>\n<p> (Read More&#8230;)<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[249,1883,385,1858,129],"tags":[],"class_list":["post-17728","post","type-post","status-publish","format-standard","hentry","category-electrical-system","category-new-reactor-design","category-nuclear-power","category-research","category-security-and-safety"],"_links":{"self":[{"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/17728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17728"}],"version-history":[{"count":2,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/17728\/revisions"}],"predecessor-version":[{"id":17730,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/17728\/revisions\/17730"}],"wp:attachment":[{"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17728"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rustybolt.info\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}